30MW High-Capacity Data Centre, Abu Dhabi, UAE
Construction of a new 30MW high-capacity data centre in Abu Dhabi, UAE.
10000
Square Metres
44
Million Contract Value
9
Months Project Duration

Project Overview

The project involved the fast-track construction of a new 30MW data centre for a hyperscale client in Abu Dhabi over four phases in a nine month period.

The date centre is built on piled pad foundations sat on sand with a traditional steel frame, along with insulated cladding panels, sand proof louver intakes and a 1 ply membrane roof. We were also responsible for the high-specification fitout of a 1,600m² office and admin area along with landscaping, hard standings, roadways, paths, and security fencing system on site.

The project involved the full mechanical and electrical fitout using a racking system. It also involved a combination of hardwire and busduct power distribution systems with back-up diesel generators, UPS 10-minute battery autonomy, and a dedicated plant farm for fuel distribution along with a sprinkler pumphouse.

We managed, coordinated and integrated all client direct vendors and long-lead equipment on the project. Additionally, we coordinated and integrated the BMS, EPMS and security systems. All systems were commissioned from Level 1 – 5 to IST.

Key Features

  • Full CSA and MEP build
  • Super flat FM2 floor screeds
  • Complex chilled water system with mechanical design temperature of 50°C
  • HVAC systems utilising top-down racking system construction with hot and cold aisle containment
  • Coordination and integration of all client direct vendors and equipment
  • Full commissioning to IST
Project Team
Client:
Confidential
Architect:
Confidential
Quantity Surveyor:
Confidential
Structural Engineer:
Confidential
M&E Consultant:
Confidential
Project Details
Contract Value:
€44 Million
Floor Area:
10,000m²
Duration:
9 months