UCC – Students Sport Centre Refurbishment
This project included extensive remediation works to existing flood damaged university sports centre, completed to extremely demanding deadlines.
4500
Square Metres
3
Million Project Value
3
Month Project Duration

Project Overview

Following substantial flood damage to the Mardyke Sports Arena and its environs at University College Cork (UCC), we were appointed to action extensive remediation works to get this vital hub operational in the shortest possible timeframe.

The entire ground floor was stripped out, including all contents, and reinstated within UCC’s specified programme, thus minimising the impact on the client and patrons of the facility. This task included the decontamination and sanitisation of all areas, tests and surveys of building elements and components, extensive mechanical and electrical installations, new swimming pool plant and equipment, and reinstatement of all floor, wall and ceiling finishes including fitted furniture, cubicles, vanity units, access control and communications systems.

The fitout element of the works comprised placing 1,200m² of specialist sports hall flooring, 560m² of specialist gym area and equipment, 1,200m² of vinyl flooring and 600m² of floor tiling, repairs to the specialist climbing wall and bleacher seating, and a total redecoration of the entire ground floor.

Key Features

  • Soft demolition and strip-out of all damaged fitout works, plant and M&E services
  • Replacement of specialist flooring, fitout of sports hall, gymnasium and changing rooms
  • Replacement of plant and decoration to all areas
  • The entire complex was fully fitted out and redecorated to restore the facility to an operational status within twelve weeks
 University College Cork / Mardyke Leisure Ltd
Project Team
Client:
University College Cork / Mardyke Leisure Ltd
Architect:
Wilson Architecture
Quantity Surveyor:
AKC
Structural Engineer:
Horgan Lynch Consulting Engineers
M&E Consultant:
JODA Engineering Consultants
Project Details
Contract Value:
€3 Million
Floor Area:
4,500m²
Duration:
3 months